Architectural & Facilities Design

MP Engineers was retained to design a load transfer and a jacking procedure for seven structural load-bearing columns (four concrete and three brick), and parts of a load bearing basement wall in a multi-story apartment building loc...

This project involved the in-depth inspection and structural rehabilitation of the existing elevated pool deck surrounding the Borough of Manhattan Community College (BMCC) pool, as well as the repair and upgrading of...

MP Engineers inspected, evaluated and recommended necessary mitigative remediation work for 20 buildings within the survey areas of the construction sites for the 86th Street and 63rd Street station areas of the Second Avenue Subway...

The United States Merchant Marine Academy (USMMA) campus, the only national service academy that is not a part of the U.S. Military is operated by the Maritime Administration of the U.S. Department of Transportation.  The 82-ac...

MP Engineers provided Inspections of Elizabeth Port Marine Terminal Buildings. The inspection team assesed the following Terminal buildings: 1130, 1400, 2380, 4030, 4060, 4070, 5000, 5070, 5080, 5120 and 5130. All inspections were p...

MP Engineers provided inspection services for JFK Airport Buildings and the W Hotel. Our assigned team inspected JFK Airport FedEx building numbers 161, 261, 262, Hanger 6, and W Hotel in Hoboken, NJ. All inspections were performed ...

MP Engineers, P.C. provided architectural and engineering design services for a replacement of an existing stone ballasted EPDM roof on three commercial buildings. New roofing for the three buildings of approximately 15,000 SF were ...

Doles Recreation Center is a community center owned by the City of Mt. Vernon. The property sits at the south end of the block bounded by South 6th Ave., South 7th Ave., West 3rd St., and West 4th St., and faces east toward South Si...

Hunter College is a comprehensive teaching, research and service institution, long committed to excellence and access in education of students in liberal arts and sciences, as well as in education, health sciences, nursing and socia...

The project involves A/E services for the renovation of the existing Toll Plaza building, structural inspection of the existing toll plaza canopy, and construction of new ITC Building and a new steel canopy for added E-Z Pass lanes....

MP Engineers was responsible for performing a detailed pre-construction condition survey and preparing a condition survey report for all buildings within the limits of an established survey area (i.e., area potentially impacted by c...

MP Engineers performed a Structural Investigation of Wet Well Walls with Gas Monitoring and Confined Space Monitoring at the Red Hook Wastewater Treatment Plant located at 63 Flushing Avenue, Brooklyn, NY. The project included a str...