Construction Management & Inspections

MP Engineers, P.C. (MPE) is providing construction management services for PS 161. Scope of work includes supervision of construction operations, preparation of daily progress reports, monitoring of schedule and processing payment r...

MP Engineers, P.C. provided Construction Support Services for the General Contractor on this multi-million dollar new construction school project. The project involved a construction of a 4 story building. The building is a composit...

MP Engineers, P.C. provided construction inspection services for this project which involved replacing and upgrading NYSDOT traffic signals and/or appurtenances at multiple locations in Nassau and Suffolk Counties under various Work...

MP Engineers (MPE) provided construction supervision services for the repair of six park playgrounds that were damaged by Superstorm Sandy on Staten Island. Parks included: Lenape Playground in Conference House Park, Lemon Creek Par...

MP Engineers provided construction inspection services for the Long Life Pavement Markings project on Route 1, 3, 4, 5, 7,9, 9W, 17, 21, 24, 28, 29, 31, 94, 124, 159, 161, 202, 206, 439.    The majority of the work i...

MP Engineers provided Construction Supervision services for the reconstruction of ballfields located in Fort Washington Park between West 163rd and West 168th Streets in New York City. The firm undertook the project when it was appr...

This project involved replacing deteriorated concrete bridge deck slabs, repairing deck spalls, repairing and reconstructing deck joints, repairing headers, removing asphalt surfacing, placing new membrane waterproofing and resurfac...

This project involved replacing deteriorated concrete bridge deck slabs including some stringers and diaphragms, repairing deck spalls, repairing and reconstructing deck joints, repairing headers, removing asphalt surfacing, plac...

HS 404Q, also known as Hunters Point Campus is a new, five-story, 145,000 SF building located next to the East River. A 1,071 student shared facility was the first building to go up for the Hunters Point South Development Project. M...

MP Engineers was responsible for an inspection, design, construction plans, specifications, cost estimates, and construction support services for two bridge superstructure replacements on the Garden State Parkway. The improvements c...

This project involved an inspection and development of specific details regarding the site’s reconstruction, area of site disturbances, and proposed landscaping at the Civil Branch of the New York Supreme Court in Manhattan. I...

PERI Formwork Systems is one of the largest providers and manufacturers of standardized formwork and scaffolding systems in the world. Their main production plant is in Weissenhorn, Germany. PERI’s large world-wide combined...

MP Engineers is providing field supervision, project management and monitoring services for eight contracts under the NYC PlaNYC 2030 Reforestation initiative.   These are multi-site, multi-year projects designe...

MP Engineers, P.C. supervised and managed an interior renovation and plumbing upgrades for PS 118K, a 4 story pre-kindergarten school in Park Slope, Brooklyn, NY.  The school is a 4 story pre-kindergarten school which until ...

MP Engineers, P.C. provide construction management to PS 256, supervise construction operations, prepare daily progress reports, monitor schedule, process payment requests and change orders, and facilitate all interagency coordin...

MP Engineers, P.C. is managing PS 314Q‘s construction and performing all construction administrative duties, including monitoring of the construction, negotiating change orders, and reviewing sub-contractor bids. MPE is coo...

MP Engineers, P.C provided Construction Management services for Public Elementary School Nathaniel Woodhull PS 35Q. The scope of work including a new facility addition of 35,000 SF and renovations to the existing facility circa 1931...

The project involved the installation of roadway safety features at 13 locations along the Pearl Harbor Memorial Turnpike Extension from Milepost P0.9 to P5.5 and 20 locations along the Garden State Parkway from Milepost 6.5 to 168....

The work on this $3.5 million project included abutment repairs at backwall and wingwall locations, as well as drainage improvements,  new tooth-dam expansion joints, aesthetic enhancement of Pier 2 so its appearance would b...