Borough of Manhattan Community College Pool Deck Restoration New York, NY
Client
City University of New York, CUNY
Owner Name
DASNY
Description

This project involved the in-depth inspection and structural rehabilitation of the existing elevated pool deck surrounding the Borough of Manhattan Community College (BMCC) pool, as well as the repair and upgrading of the mechanical equipment located below the pool deck that supports the operation of the existing Steam Room and Pool Pump\Filtration Room. MP Engineers was responsible for the development of contract plans, construction drawings and specifications for the replacement of the existing concrete slab floor structure located above the plenum room corridor with a reinforced concrete slab supported by a reconditioned steel framed pool deck. In addition, MPE designed and developed contract plans for the replacement of the drainage/plumbing system for the pool deck and shower room. We also prepared electrical plans for the demolition and the replacement of electrical ground wiring at the pool deck, existing electrical junction boxes, and the existing underwater pool lighting. This included all electrical conduit/wiring up to the nearest electrical panel. Contract plans and specifications for architectural finishes on the inside of the pool and office walls were also developed.


MPE designed and prepared contract plans for the temporary support shoring and protection systems for the mechanical equipment located below the deck and duct work required for the pool deck reconstruction.

Services Provided
  • Building Design
  • Condition Inspection of Buildings
  • Construction Documents
  • Construction Inspection
  • Electrical Design
  • Mechanical Design
  • Permitting and Approvals
  • Plumbing Design
  • Structural Investigation
  • Structural Steel Design
  • Structural Steel Repair
PDF: